Text
Fixture Planning for Multi-Workpiece Setup for Make-to-Order Industry
An alternative method to reduce setup time is to simultaneously carry out fixture
planning for several parts in one setup planning. This is possible due to the size of parts which are
relatively small to the size of the machine work bed, typically found in a make-to-order industry.
This research proposed a fixture planning method for multi-workpiece setup. The fixture planning
method comprised two stages: 1) multi-workpiece layout and 2) 3-2-1 pin location. An example of
multiple workpiece setup is illustrated in this paper to point out the method's applicability. Future
research activity will integrate the proposed collaborative human-robot assembly design system
method
| UIB00007701 | Tersedia |
Tidak tersedia versi lain